https://www.thelandsite.co.uk/files/articles/ec6ebc196dab11e99353024b03131eda/141-5fa3fecb49990422257609.jpeg 47

Update: Site Progress at our Frampton Cotterell Project

Posted by Meraki Architecture Ltd on 6th November 2020 -

title

The detached double garage at our Frampton Cotterell project is developing very nicely with the roof structure now going on.

The main house works however, have ground to a halt as we wait for the steel frame for the back of the house to be manufactured.

 


Thomas Assal

Architectural design company based in Herefordshire, England

Link to Meraki Architecture Ltd business profile

12th May 2025
Council Seeks to Oppose Two Major Solar Farm Projects
Councillors in Suffolk have spoken out against two giant solar farms, set to cover a total of almost 1,200 acres
Read more
18th January 2025
Peak Resort Breaks Ground
The long-awaited PEAK gateway resort situated on the eastern boundary of the Peak District has broken ground. 
Read more
14th January 2025
Top Garden Design Trends for 2025
As we step into 2025, the world of garden design is blooming with fresh and inspiring ideas
Read more