https://www.thelandsite.co.uk/articles/site-progress-at-our-frampton-cotterell-project
                                                    02-10-2020
                                                https://www.thelandsite.co.uk/files/articles/ec6ebc196dab11e99353024b03131eda/141-5f76de42851dc560514292.jpeg
                        31
                    
                    Site Progress at our Frampton Cotterell Project
Posted by Meraki Architecture Ltd on 2nd October 2020 -
![]()
The ground floor slab has now been cast at our Frampton Cotterell project.
The blockwork walls will now begin to fly up and the building will start to take some shape.